Services > Public Works

Capital Improvement Projects

One of the responsibilities of the Public Works Department is the administration of public improvements within the Village. The Department prepares the 5-year Capital Improvement Plan (CIP) and implements the plan by producing designs, plans and specifications and managing/performing construction inspections of capital improvement projects. The CIP, updated on an annual basis, addresses the Village's infrastructure needs. The CIP includes street, water system, storm sewer system, sanitary sewer system, street lighting, sidewalk, and/or other special projects.

The current and recently completed major capital improvement projects in the Village of Wheeling are as follows:

VILLAGE PROJECTS
       This document is available to view in PDF format. Summer 2013 Capital Projects

       This document is available to view in PDF format. Water Meter Upgrade Program

       This document is available to view in PDF format. Dundee Road Pedestrian Path

          2014 Corrugated Metal Arch Pipe Replacement Project

          2014 Mors Avenue Watermain Replacement Project

          2014 Street Improvements Project

          2014 Meadow Lane Improvements

          2014 Jeffery Avenue Bridge Rplacement

          2014 Palm Drive, Birch Trail, and Laurel Trail Watermail Replacement

ILLINOIS DEPARTMENT OF TRANSPORTATION PROJECTS
       This document is available to view in PDF format. Wolf Road Bridge Replacement Over Palatine Road

LAKE COOK ROAD CONSTRUCTION
Please click on the title above for details about the road-widening project at the Lake Cook and Waukegan Road intersection in Deerfield. Beginning the week of February 18, in preparation for the upcoming project work, the pre-construction utility relocations will begin. For more information email: lakecookroad@deerfield.il.us or call 847/945-5000.

WILLOW ROAD CONSTRUCTION
Stay Informed about the Willow Road Redevelopment Project The Illinois Department of Transportation (IDOT) plans to start their redevelopment of Willow Road this spring. For live traffic updates, detailed maps of the project design, and up to date information on the construction activity, please click on the title above.



      

If you have any questions please call Tim Merrihew, Capital Projects and Design Manager, at (847) 279-6911.

 

Untitled 1 Decrease font sizeIncrease font size   Back to Home PageContact Us   
Property Search

Learn more about your community and services around your property.

Enter an address to start:


                Wheeling Calendar

The Village of Wheeling
2 Community Boulevard
Wheeling, IL 60090
Mon ~ Fri    7am ~ 5pm
Ph: (847) 459-2600
Fax: (847) 459-9692

Click Here for a complete department directory

Anonymous Hot Line
Code Enforcement Complaints
(847) 459-CODE