Preliminary Site Inspection Policy
Pursuant to Section R-112.1.5 of the CABO One and Two Family
Dwelling Code, 1992 Edition, a preliminary site inspection is
hereby required for all detached single-family residential
properties. This inspection will be conducted by either
Building or Engineering Division personnel and shall be
scheduled by the permitee or his representative at the same
time or as a part of the currently required insulation
inspection.
Elements of construction that are required to be completed and
subject to inspection are:
- All stoops and service walks.
- Gravel base for driveway.
- Final grading of the lot with topsoil.
The insulation inspection will not be conducted unless the
above items are completed.
Fine grading, site stabilization, grade elevations, final
drive surface, and public improvements will continue to be
inspected as a part of the final inspection and must be
completed prior to issuance of occupancy certificates.
This policy shall be in effect beginning May 31, 1994.
Government
| Services | Community
| Development
| Reference
Desk
Search | Site Map
| Home
The Village of Wheeling,
Illinois
255 West Dundee Road
Wheeling, IL 60090
(847) 459-2600
Click here to send feedback
to the Village of Wheeling.
All information © 2007 Village of Wheeling, Illinois
Site Use
Policy
Site Design/Development by

|