Back to the Village of Wheeling home page Site Map Search the Site
Village of Wheeling, IL
"A Community of Choice"

Click Here to submit your Questions / Comments

Sign-up for our
E-News service

 

Government in Wheeling...Meet our officials and learn more about the Village Government here
 
Community Development
Economic Development
Engineering
Finance and Administration
Fire
Legal
Police
Public Works
Real Estate Tax Assessment
Refuse Services
Senior Services
 
Living in the Village of Wheeling...Everything you want to know about Our Community can be found here
 
Doing Business in Wheeling...This section includes Economic Development information
 
Wheeling At Your Fingertips...Forms and Permits, Municipal Code, Village Directory, Send Feedback to the Village and more can be found at the Reference Desk
 
Anonymous Hot Line Code Enforcement Complaints 
(847) 459-CODE or Use 
Our Feedback form

 


Click on the above GovDeals image to see items for sale from the Village of Wheeling.

 

You may also want to visit:


for other online government auctions. Village of Wheeling is using PropertyRoom.com to sell our surplus items. 

 

Permit Info and Requirements Overview  |  Building Permit Procedure
 | Carbon Monoxide Detector | Common Permits Required  |  Construction Regulations and Inspections  |  Decks
 Demolitions  | Dog RunsDrain Tile Installation  |  Driveways  |  Fire Service Lines
Garages (Detached)
  | Gazebos  |  Lawn Sprinklers  |  Liquid Storage Tanks  |   Pools/Tubs/Spas
Restaurant Permits/Licenses  |  Roofing Replacement  |  Satellite DishesSewer Line Cleanout
Sheds | Siding Replacement | Temporary Structures

Drain Tile Installation For
New Construction

Related Forms/Permits

No Drain Tile is to be installed until:

1. Foundation wall poured and all forms stripped. 

2. All exterior wall ties are removed. 

3. All the holes are tarred over. 

4. All honeycombs are patched and tarred over. 

5. Footings are dry and swept clean. 

6. Walls and tops of footings damp-proofed.

After above is completed, drain tile may be installed.

1. Top of drain tile to be installed at or below the area to be protected, ordinarily placed at the bottom of the footing level, on top of a minimum 2 inch washed gravel bed (IRC Section R-405.1). 

2. Cover with washed gravel (no pea gravel) at least 1 foot beyond outside edge of the footing and 6 inches above the top of the footing (IRC Section R-405.1). 

3. Cover with a filter membrane material, such as red rosin paper or building paper, held tight to foundation wall. Cover or secure paper with dirt or stone to hold it in place during backfill (IRC Section R-405.1). 

4. If a nylon sock covered drain tile is used, the filter membrane material is not required. 

5. Window well drains shall have grates installed. The vertical drain pipe shall be blocked out from the foundation wall with at least (2) 2' x 4's or approximately 3 inches. The pipe shall be installed as near the center of area well as possible. All work shall be conducted, installed and completed in a workmanlike and acceptable manner so as to secure the results intended by the code.

 

 

Government  |  Services  |  Community  |  Development  |  Reference Desk
Search
  |  Site Map  |  Home

The Village of Wheeling, Illinois
255 West Dundee Road
Wheeling, IL  60090
(847) 459-2600

Click here to send feedback to the Village of Wheeling.

All information © 2007 Village of Wheeling, Illinois 

Site Use Policy

 

Site Design/Development by
Bringing the World to Your Corner of the World