| Demolition Permit Requirements |
|
DEMOLITION PERMIT
REQUIREMENTS
The following information must be submitted to the
Community Development Department before a demolition
permit can be issued:
1) Letter of authorization from the owner.
2) Up to date plat of survey - indicating building(s)
to be demolished, location of any wells, septic tanks or
cisterns.
3) A list of all people/firms connected with the
demolition with their addresses and telephone numbers.
This includes the general contractor, well sealer, septic
pumper/hauler, etc.
4) A performance bond or other performance surety
acceptable by the Village Attorney in the amount of 150%
of the demolition contract for Village owned properties.
5) A copy of a Certificate of Insurance in the amount
of: $300,000.00 - property damage, and $500,000.00 -
personal injury (note the dollar amount changes for
buildings over two stories).
6) A list of work the demolisher is to do.
7) The Cook County Department of Environmental Control
(312-603-8200) Chicago, Illinois requires you apply for a
demolition permit from their agency (application is
attached).
8) *Affidavit that all utilities, i.e. gas, electric,
phone, water and sewer have been abandoned/removed.
Northern Illinois Gas (800)
730-6114 (48 hour notice)
Commonwealth Edison - (800)-334-7661
(48-72 hour
notice)
Water/Sewer - Wheeling Public Works
(847) 229-4600
(24 hour notice) see attached sheet.
Water meter removal - Wheeling
Public Works
(847) 229-4600 (24 hour notice) see
below.
(*) IT IS THE RESPONSIBILITY OF THE DEMO CONTRACTOR
TO CONTACT J.U.L.I.E. (1-800-892-0123) FOR UTILITIY
LOCATES AS WELL AS LOCAL PHONE, CABLE PROVIDER'S ETC. TO
ENSURE PROPER DISCONNECTS HAVE BEEN COMPLETED.
9) A field inspection report by the Village Health
Officials verifying proper abandonment and/or sealing of
private water and sewer systems must be on file.
10) A completed Building Permit Application must be
included with the above items.
AFFIDAVIT OF COMPLETION
MUST BE ON FILE BEFORE DEMOLITION PERMIT CAN BE ISSUED.
DEMOLITION NOTIFICATION
PROCEDURES FOR
PUBLIC WORKS
1. Public Works requires no less than 48 hours notice
prior to demolition so that water services can be shut off
at the Buffalo-box, and the meter can be removed and
secured.
2. All contact regarding these notifications should go
through either the Public Works Director or Assistant
Director at (847) 229-4600.
3. Public Works requires notification for any permanent
structure that is being taken down that has active or
abandoned water or sewer service.
4. The only significant inspection that we require is
during the phase of service line removal where the
contractor has removed said service from the Village's
main line. This inspection must be completed before the
contractor begins to backfill their excavation.
Some additional points of concern:
1. Regarding any language referencing where services
are to be disconnected, we would like the phrase "at
the point of connection to the Village main line"
used to properly pinpoint the exact location of
separation.
2. Again, we must inspect the disconnect before the
contractor backfills.
3. The contractor is responsible for the removal of the
buffalo-box following our inspection of the disconnect and
approval to do so.
4. If the property is slated for redevelopment the sewer
line must be televised before it can be reinstated.
Appointments are available through Public Works. This
requirement is only appropriate assuming the existing
sewer service line remains of adequate size and location
for the new structure.
Revised 1/1/06
Government
| Services | Community
| Development
| Reference
Desk
Search | Site Map
| Home
The Village of Wheeling,
Illinois
255 West Dundee Road
Wheeling, IL 60090
(847) 459-2600
Click here to send feedback
to the Village of Wheeling.
All information © 2007 Village of Wheeling, Illinois
Site Use
Policy
Site Design/Development by

|