CONSTRUCTION REGULATIONS & INSPECTIONS BUILDING
(847) 459-2620 / ENGINEERING (847) 459-2985
THE FOLLOWING RULES AND REGULATIONS HAVE BEEN COMPILED
SO THAT CONTRACTORS WORKING IN OUR VILLAGE WILL BE AWARE
OF THE VILLAGE OF WHEELING REQUIREMENTS FOR INSPECTIONS.
HOURS OF CONSTRUCTION - MONDAY THROUGH SATURDAY -
7:00AM - 6:00PM
THE WHEELING POLICE DEPARTMENT WILL ISSUE TICKETS FOR
ANY CONSTRUCTION WORK BEING DONE OUTSIDE OF THESE HOURS.
PROJECTS INVOLVING SITE DEVELOPMENT A meeting at the
site is required before construction of any type is
started. " The site boundaries must be clearly
marked. " All trees that are to be saved must also be
clearly marked and protected. To schedule this on-site
meeting, please call The Engineering Division of Public
Works at (847) 459-2985. NO SITE WORK OF ANY TYPE IS TO
START UNTIL AFTER THIS MEETING.
BUILDING INSPECTIONS REQUIRED
1. The superintendent in charge of the construction shall
call for all inspections, and must be present at the time
of the inspection to sign the inspector's field
inspection report.
2. All footings will be formed and rebars in place, if
any, before the inspection is made. After inspection
reports have been received and approved, the job may
proceed. Concrete shall not be on site until approval
has been made.
3. All foundation walls must be formed and rebars in
place, if any, before the inspection is made. When
inspection field reports have been received and approved,
the job may proceed.
4. After the forms are removed from the foundation
walls, a spot survey is required indicating the
location of the building on the lot and the elevation of
the top of the construction wall. Upon approval by
Community Development Department that the foundation wall
is properly set on the lot, the work may continue.
5. All underground work such as plumbing, electric,
heating and drain tiles must be inspected. Signed field
inspection reports must be given before any backfilling.
6. If there is a sanitary sewer under the floor a water
test is required before the concrete floor is poured.
7. When the above is finished, compacting of fill and
laying of mesh and vapor barrier can be completed and
inspection called for. When inspection of all trades
involved has been completed and signed field inspection
reports received, the slab may be placed.
8. Carpentry-rough, electric-rough, mechanical-rough,
and plumbing-rough are inspected at the same time and
before any firestopping and or insulation is installed.
After all inspections are approved and signed field
reports have been received, the work may proceed.
9. Residential construction - Firestopping and
Insulation Inspections - After the insulation is
installed and before any sheetrock is installed the
insulation and firestopping must be inspected and
approved. You are also required to schedule a preliminary
site inspection with the Engineering Department at this
time.
10. Ceiling inspection will be made after channels are
installed, lights installed, HVAC defusers and sprinkler
heads dropped. When report sheets are signed and approved,
the ceiling tile may then be installed.
11. A final inspection is given when all work is 100%
complete, which includes interior and exterior site work.
This inspection will be for the certificate of occupancy .
12. The building may be occupied only after a
certificate of occupancy is issued, a water meter is
installed, and a business license issued if required.
A Business License should be applied for as soon as
possible to avoid delay of the move in and occupancy of
the building.
ALL INSPECTIONS MUST BE SCHEDULED TWENTY-FOUR (24)
HOURS IN ADVANCE. TWENTY-FOUR (24) HOUR NOTICE MUST BE
GIVEN TO THE PUBLIC WORKS DEPARTMENT (847) 229-4600 FOR
WATER METER PICK-UP.
Please note that we have individual inspectors for most
of the trades, structural, mechanical, electrical,
plumbing and civil engineering (Public Works). It is the construction
superintendent's responsibility to insure that all of
the appropriate inspections have been inspected and
approved prior to continuing the work.
Your cooperation will help speed up inspection time and
reduce time delays caused by improper scheduling of
inspections or reinspection.
Please call (847) 459-2620 to schedule all building
inspections. Please call (847) 459-2985 to schedule all
civil engineering inspections.
NOTE: TOILET FACILITIES MUST BE AVAILABLE TO THE
WORKERS THROUGHOUT THE DURATION OF THE CONSTRUCTION
PROJECT.
CONSTRUCTION SITE FENCING MAY BE REQUIRED PRIOR TO
COMMENCEMENT OF WORK AT THE DISCRETION OF THE BUILDING
DIRECTOR.
Revised 1/1/06
Government
| Services | Community
| Development
| Reference
Desk
Search | Site Map
| Home
The Village of Wheeling,
Illinois
255 West Dundee Road
Wheeling, IL 60090
(847) 459-2600
Click here to send feedback
to the Village of Wheeling.
All information © 2007 Village of Wheeling, Illinois
Site Use
Policy
Site Design/Development by

|